WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

167

Discipline/Origin

Well test
No origin

Well

Brasse Appraisal
31/7-2 S

Date created

2017/09/28
2992 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
N/A

Deepsea Bergen


Section N/A. What happened:
N/A

What Was Planned

Perform DST

What Was Learned

It was identified that a load case with base oil in the tubing and brine in the annulus could lead to the highest tubing head pressure when rupturing the single shot reversing valve

What Actions Are Required

Include this load case in the tubing design